首页
学习
活动
专区
圈层
工具
发布
社区首页 >问答首页 >使用cron作业每月使用MySQL选择查询更改PHP变量

问使用cron作业每月使用MySQL选择查询更改PHP变量
EN

Stack Overflow用户
提问于 2014-02-01 04:36:00
回答 1查看 1.2K关注 0票数 0

好的,我有很多零散的拼图。我正在尝试做一个应用程序,更新我的网站底部的报价每月(即‘引用的月份“)。我使用PHP访问MySQL服务器,MySQL服务器中有引号。

在数据库中,表名为“引号”,并包含“引号”、“引号”、“作者”和“datetime_used”列。“datetime_used”列的默认值为1991年,我使用它来检查我是否在去年使用过该引用。如果随机选择的报价时间小于当前时间减去1年,则该报价将用作本月的新报价。如果使用引号,“datetime_used”将更新到当前时间。

我认为要执行的步骤是: 1.运行运行以下PHP脚本的cron作业(每个月将运行):

代码语言:javascript
复制
<?php
//Make connection
$connect = mysqli_connect("localhost","user","password","dbname");

//Check connection
if (mysqli_connect_errno($connect))
  {
  echo "Failed to connect to MySQL: " . mysqli_connect_error();
  }

//Run query
//Select random quote
$result = mysqli_query($connect,
"SELECT quotation, author FROM quotes 
    WHERE datetime_used <= NOW() - INTERVAL 1 YEAR 
    ORDER BY RAND() 
    LIMIT 1");

$row = $mysqli_fetch_array($result);
$quote = $row['quotation'];

//Update the datetime_used column to NOW()
mysqli_query($connect,"
UPDATE quotes SET datetime_used=NOW() 
    WHERE quotation='$quote'");

mysqli_close($connect);
?>
  1. 然后将上面的cron作业脚本生成的$quote包含到我的网站代码中:

代码语言:javascript
复制
<footer>
<p>Quote of the month: 
<?php
//INCLUDE THE $quote SOMEHOW
echo $quote;
?>
</p>
</footer>

因此,我的问题是如何使cron作业以一种方式更新$quote变量,以便将更新后的变量包含到我的网站代码中。还是有更好的方法来做这件事?

编辑:我想出的代码似乎很有效。

代码语言:javascript
复制
<?php
//Make connection
$connect = mysqli_connect("localhost","root","root","test");

//Check connection
if (mysqli_connect_errno($connect)) {
    echo "Failed to connect to MySQL: " . mysqli_connect_error();
}

//Check for month difference between this month and most recently used quote as well as get the quote and author to store
$check = mysqli_query($connect, 'SELECT MONTH(NOW())-MONTH(datetime_used) AS m, quotation, author FROM quotes ORDER BY datetime_used  DESC LIMIT 1');
$checkarray = mysqli_fetch_array($check);
$quote = $checkarray['quotation'];
$author = $checkarray['author'];
//If the month difference if 1 or greater, it selects a new quote
if ($checkarray['m']) {
    $result = mysqli_query($connect,
    "SELECT quotation, author FROM quotes 
        WHERE datetime_used <= NOW() - INTERVAL 1 YEAR 
        ORDER BY RAND() 
        LIMIT 1");

    $row = mysqli_fetch_array($result);
    $quote = $row['quotation'];
    $author = $row['author'];

    //Update the datetime_used column to NOW()
    mysqli_query($connect,
    "UPDATE quotes SET datetime_used=NOW() 
        WHERE quotation='$quote' AND author='$author'");
}

mysqli_close($connect);

echo "\"$quote\"
</cite>
-$author";
?>
EN

回答 1

Stack Overflow用户

回答已采纳

发布于 2014-02-01 05:00:04

我觉得你把所需的步骤复杂化了。你只需要:

  • 通过php,在页面加载上运行一个查询,检查以下引号表:
  • 如果在过去的30天中选择了当前的报价
  • 如果是,请使用它。
  • 如果没有,请选择一个新的报价,该报价的日期不是过去一年。
  • 如果找到,请用当前日期更新date_used列

不需要克伦的工作。我假设这是一个低流量的站点,所以在每个页面访问上运行检查并不是一个性能问题。如果确实需要,可以使用缓存系统缓存所选引号,并避免在30天后检查数据库。

票数 0
EN
页面原文内容由Stack Overflow提供。腾讯云小微IT领域专用引擎提供翻译支持
原文链接:

https://stackoverflow.com/questions/21494117

复制
相关文章

相似问题

领券
问题归档专栏文章快讯文章归档关键词归档开发者手册归档开发者手册 Section 归档